Foundation construction and quality inspection of tower caisson pile 输电铁塔灌注桩基础施工及质量检测
2.
Reason of defect in pile body of bored caisson pile and keep a lookout 钻孔灌注桩桩身缺陷的原因及防范
3.
Use 425 cement can make c40 commercial concrete . 2 applied to the construction of thin - walled structures and caisson pile concrete . 3 applied to the large concrete which demand to decrease the heat of hydration 本系统可广泛应用于建筑屋面地面,隔墙板墙体填充砌块热力管道的保温隔热防水防腐与防渗等。